Claim C20 · methodological · entrylib:2026.000008@v2 · 2026-11-14

Corrected · 14 November 2026 at 12:59 UTC

Version 1 labelled the review's findings and recommendations extension, with an extends relation to the very works cited as their evidence, which said they extend those works; they state what those works establish, so version 2 labels them synthesis (claimset v0.43) and drops those relations, keeping extension only for C16, the one rule that goes beyond its sources, which extends Gneiting and Raftery (2007); and, at the guarantor's request, it rewords C3 (RMSSE as an example of the scaling), C4 (MAE and MASE as the main measure only when the mean and median forecasts coincide), C8 (absolute-error measures avoided on intermittent series), C13 (sharpness compared only among calibrated distributions and intervals) and C24 (choose a measure for what the methods predict, even if precedent used another).

By Ivan Svetunkov (ORCID 0000-0001-7826-0281)

Evaluating forecasts and classifiers: which measures, scoring rules and tests to use · C20

Principal claim C20 of this paper (Svetunkov, I. (guarantor), 2026), with what it rests on. Read the whole paper.

Text file for AI

Text file: the claim with what it rests on as plain text, to attach when your assistant cannot open the address.

The message

Read https://entrylib.org/p/2026.000008/C20, one claim of a research paper with the evidence it rests on. Tell me briefly what it says and how well it is supported. If you cannot open the link, tell me instead of guessing. Then wait for my questions.

The claim

SupportS 80C20 · methodological · novelty: summarises earlier work, by the authors

When methods are compared over many series, their accuracy should be summarised by the mean, the median and the quartiles of a scaled measure across the series, such as RMSSE or MASE.

Claims it rests on

SupportS 93C46 · methodological · novelty: summarises earlier work, by the authors

Scaled errors, as in MASE, are independent of the scale of the data and can be averaged over series on different scales.

SupportS 94C50 · methodological · novelty: summarises earlier work, by the authors

Averages of a performance measure over many data sets are susceptible to outliers.

Evidence

W20 · argument · deductive · premises C46, C50

A scaled measure can be averaged over series, but averages over many data sets are susceptible to outliers; the median and the quartiles show how accuracy is spread over the series, which the mean alone hides.

Limitations

L3 · measurement · reduces precision · affects C29, C30, C31, C32, C33, C34, C35, C36, C37, C38, C39, C44, C46 · mitigation: none

Section and theorem numbers for Gneiting 2011, Gneiting and Raftery 2007, Gneiting, Balabdaoui and Raftery 2007 and Hyndman and Koehler 2006 were read in their preprints or authors' copies (arXiv:0912.0902 and the authors' web pages), whose numbering may differ from the published versions.

L5 · researcher position · could bias magnitude · affects C1, C2, C3, C4, C5, C6, C7, C8, C9, C10, C11, C12, C13, C14, C15, C16, C17, C18, C19, C20, C21, C22, C23, C24, C25, C26, C27, C28, C29, C30, C31, C32, C33, C34, C35, C36, C37, C38, C39, C40, C41, C42, C43, C44, C45, C46, C47, C48, C49, C50, C51, C52, C53 · mitigation: none

The claims restate EntryLib's study-planning guide on prediction, drafted by an agent of the same system that checked them here, and were stated before the works were read; the works were read to confirm what the guide states, and no search was run for work that disagrees with it.

Definitions

Variables and measures 2

D6 RMSSE: Root mean squared scaled error: the RMSE of a series' forecasts divided by the in-sample RMSE of the one-step naive forecast of that series, so that series on different scales can be averaged. Source: Makridakis et al. (2022).

D8 MASE: Mean absolute scaled error: the MAE of a series' forecasts divided by the in-sample MAE of the one-step naive forecast of that series. Source: Hyndman and Koehler (2006).

References

  1. Hyndman, R. J., Koehler, A. B., 2006. Another look at measures of forecast accuracy. International Journal of Forecasting 22, 679–688. https://doi.org/10.1016/j.ijforecast.2006.03.001 Used by: C46, D8, A7
  2. Makridakis, S., Spiliotis, E., Assimakopoulos, V., 2022. M5 accuracy competition: Results, findings, and conclusions. International Journal of Forecasting 38, 1346–1364. https://doi.org/10.1016/j.ijforecast.2021.11.013 Used by: D6
  3. https://jmlr.org/papers/v7/demsar06a.html Used by: C50, A4

Artefacts

  • A4 · data · https://jmlr.org/papers/v7/demsar06a.html Statistical comparisons of classifiers over multiple data sets (Demsar 2006, JMLR 7, 1-30) (application/pdf), saved by hand on 2026-11-13; recorded in the lab record as SR4 on 2026-11-13. venue: Journal of Machine Learning Research. Written by others. demsar06a.pdf
  • A7 · data · Hyndman and Koehler (2006) Another look at measures of forecast accuracy (preprint of Hyndman and Koehler 2006, IJF 22(4), 679-688, doi:10.1016/j.ijforecast.2006.03.001) (application/pdf), saved by hand on 2026-11-13; recorded in the lab record as SR7 on 2026-11-13. venue: International Journal of Forecasting. Written by others. mase.pdf

Score

Scores are computed by rules from the claimset file (EntryLib rubric 0.7): they check the record, not the science, and may change as the rubric and reviews develop. The rubric.

C20: 80, Well supported

Novelty: summarises earlier work, by the authors

  1. −10 Evidence Rests on cited work only; cited work read in full, without the passage it rests on; an argument from other claims. To remove it: Support the claim with evidence the claimset records, citing the result entries or table rows it reports, or have its proof checked; for cited work, read the work in full and quote the passage the claim rests on from a captured copy (claimset extension review).
  2. −6 Open problems Limitation L5 (could bias magnitude, not mitigated): The claims restate EntryLib's study-planning guide on prediction, drafted by an agent of the same system that checked them here, and were stated before the works were read; the works were read to confirm what the guide states, and no search was run for work that disagrees with it. To remove it: Mitigate it with evidence, or narrow the claim's scope so that it no longer applies.
  3. −3 Plan The review's search for the literature: none is recorded; the claims were confirmed against works the authors knew. To remove it: Record the protocol, then the searches and the screening of what they found (claimset lab protocol, search, screen), and export them.
  4. −1 Open problems Limitation L3 (reduces precision, not mitigated): Section and theorem numbers for Gneiting 2011, Gneiting and Raftery 2007, Gneiting, Balabdaoui and Raftery 2007 and Hyndman and Koehler 2006 were read in their preprints or authors' copies (arXiv:0912.0902 and the authors' web pages), whose numbering may differ from the published versions. To remove it: Mitigate it with evidence, or narrow the claim's scope so that it no longer applies.

C46: 93, Well supported

Novelty: summarises earlier work, by the authors

  1. −6 Open problems Limitation L5 (could bias magnitude, not mitigated): The claims restate EntryLib's study-planning guide on prediction, drafted by an agent of the same system that checked them here, and were stated before the works were read; the works were read to confirm what the guide states, and no search was run for work that disagrees with it. To remove it: Mitigate it with evidence, or narrow the claim's scope so that it no longer applies.
  2. −1 Open problems Limitation L3 (reduces precision, not mitigated): Section and theorem numbers for Gneiting 2011, Gneiting and Raftery 2007, Gneiting, Balabdaoui and Raftery 2007 and Hyndman and Koehler 2006 were read in their preprints or authors' copies (arXiv:0912.0902 and the authors' web pages), whose numbering may differ from the published versions. To remove it: Mitigate it with evidence, or narrow the claim's scope so that it no longer applies.

C50: 94, Well supported

Novelty: summarises earlier work, by the authors

  1. −6 Open problems Limitation L5 (could bias magnitude, not mitigated): The claims restate EntryLib's study-planning guide on prediction, drafted by an agent of the same system that checked them here, and were stated before the works were read; the works were read to confirm what the guide states, and no search was run for work that disagrees with it. To remove it: Mitigate it with evidence, or narrow the claim's scope so that it no longer applies.